How to qualify a second supplier before moving production orders

Back to Company Posts

Use a common RFQ, a delivered-cost comparison and a pilot order to decide whether a second supplier can take on part of your production volume.

How to qualify a second supplier before moving production orders

Before moving orders to a second supplier, decide which disruption you need that supplier to cover. If your current shop runs short of machine time, another shop may solve the problem. If the concern is a coating line shutting down, two shops that use the same coater leave you exposed. Put that distinction in the request for quotation (RFQ) before you ask for prices.

Define the part and the volume you can award

Start with one part. Give every bidder the same drawing revision, material grade, finish, critical dimensions and tolerances. Identify what receiving will inspect and how it will decide whether to accept a lot. Ask bidders to flag exceptions rather than silently quote a different material or process.

Separate the pilot quantity from the order size you expect after approval. If you buy 2,000 units a month but intend to move only 500, request recurring pricing for 500. Ask separately how much notice the supplier would need to produce more during an interruption. A surge estimate is not a capacity commitment.

Shortlist suppliers against the disruption

Use the U.S. company directory to identify potential shops, then confirm capabilities directly. Ask where the part would be made, which steps would be subcontracted and whether a pilot would use the same site, tooling and finishing process as recurring orders. If an independent coating line is essential, resolve that question before paying for samples.

Request quotes you can compare line by line

You can browse public requests for quotation on Corplace for examples as you draft your request. Give shortlisted suppliers one response format and the same delivery destination. Ask each to specify:

  • Unit price at the pilot quantity and at the planned recurring quantity, plus any minimum charge.
  • Tooling, inspection, packaging and freight charges, identifying which are already included in the unit price.
  • Time from order release to arrival at your dock, including transit, and whether the clock starts at order receipt or drawing approval.
  • Inspection records supplied with each lot and the proposed remedy and replacement lead time for rejected parts.

Worked hypothetical: Compare a 500-piece release

Shop A quotes $4.80 per bracket plus $180 freight, or $2,580 delivered. Shop B quotes $5.05 per bracket with freight included, or $2,525 delivered. Assuming identical specifications and no other recurring charges, Shop B costs $55 less per release despite its higher unit price.

Now suppose Shop B also needs a $330 fixture that Shop A does not. Six recurring releases would recover that difference at $55 per release. If you expect to place only three, Shop A would cost $165 less overall. Keep pilot charges separate, and compare promised arrival dates against your production schedule before choosing which shop to trial.

Make the pilot an acceptance decision

Before issuing the pilot order, have purchasing and quality agree on the inspection method, delivery window and required records. On receipt, check the brackets against the specified revision and test their fit in the intended assembly. Record the actual arrival date and invoice total alongside the quote.

If the parts pass but arrive late, approve the quality result without treating delivery performance as proven. Resolve the cause before shifting time-sensitive orders. If all criteria are met, release the agreed share and review the first recurring lot before increasing volume.